Multi-Agent Path Finding with Delay Probabilities
Hang Ma, T. K. Satish Kumar, Sven Koenig
TL;DR
MAPF solvers generally assume perfect execution even though agents may be delayed, and current solvers do not use estimable delay probabilities. This paper formalizes MAPF-DP, develops robust execution policies and a two-level solver, and reports that AME appears to find lower average makespans than the compared solvers.
Problem
Current MAPF solvers typically assume perfect execution and do not use estimable delay probabilities, which often leads to replanning or execution failures.
Source: Introduction · p. 1, Background and Related Work · p. 2Method
The paper formalizes MAPF-DP, develops decentralized robust execution policies, and presents the two-level Approximate Minimization in Expectation solver for generating valid plans.
Source: Introduction · p. 1, Approximate Minimization in Expectation · p. 4Results
AME appears to find lower average makespans than Adapted CBS, which appears to find lower average makespans than Push and Swap.
Source: Experiment 1: MAPF Solvers · p. 6Takeaways & Limitations
The proposed combination targets valid plans and collision-free execution despite delays while seeking small average makespans.
Source: Conclusions · p. 7The low-level search is described as AME’s weakest part because it uses many approximations to keep runtime small.
Source: Future Work · p. 6
Abstract
from arXiv · showhide
Several recently developed Multi-Agent Path Finding (MAPF) solvers scale to large MAPF instances by searching for MAPF plans on 2 levels: The high-level search resolves collisions between agents, and the low-level search plans paths for single agents under the constraints imposed by the high-level search. We make the following contributions to solve the MAPF problem with imperfect plan execution with small average makespans: First, we formalize the MAPF Problem with Delay Probabilities (MAPF-DP), define valid MAPF-DP plans and propose the use of robust plan-execution policies for valid MAPF-DP plans to control how each agent proceeds along its path. Second, we discuss 2 classes of decentralized robust plan-execution policies (called Fully Synchronized Policies and Minimal Communication Policies) that prevent collisions during plan execution for valid MAPF-DP plans. Third, we present a 2-level MAPF-DP solver (called Approximate Minimization in Expectation) that generates valid MAPF-DP plans.
Introduction
MAPF solvers can scale to large instances, but imperfect execution delays are not used by current solvers and can lead to replanning or execution failures. The paper formalizes MAPF-DP and introduces robust execution policies and a two-level solver aimed at small average makespans.
Introduction
- Current MAPF solvers do not use estimable delay probabilities, which often leads to frequent, runtime-intensive replanning or plan-execution failures.MAPF seeks collision-free paths from agents’ starts to goals in an environment.Source: Introduction · p. 1
- MAPF-DP models agents moving on an undirected graph with wait and potentially delayed move actions, and requires paths plus an execution policy that avoids collisions.Collisions include agents sharing a vertex at the same time or traversing an edge in opposite directions.Source: Introduction · p. 1
- The paper proposes Fully Synchronized and Minimal Communication Policies to prevent collisions during execution, and Approximate Minimization in Expectation to generate valid plans.The contributions target small average makespans.Source: Introduction · p. 1
Background and Related Work
Prior MAPF work includes search-based solvers, while most current solvers assume perfect execution. Probabilistic planning offers alternatives, but the cited approaches face scalability or collision-prevention trade-offs.
Background and Related Work
- MAPF is NP-hard to solve optimally for flowtime minimization and hard to approximate within any constant factor below 4/3 for makespan minimization.Search-based solvers may be optimal, bounded suboptimal, or suboptimal.Source: Background and Related Work · p. 1
- Current MAPF solvers typically assume perfect execution, whereas using probabilistic information about imperfect execution can reduce replanning and plan-execution failures.The passage presents this as a potential benefit of exploiting execution uncertainty.Source: Background and Related Work · p. 2
- POMDPs can model MAPF-DP but are tractable only for very small settings, while decentralized approaches cannot prevent collisions and centralized approaches can scale poorly.The passage also notes limitations of sparse-interaction and fully decentralized alternatives.Source: Background and Related Work · p. 2
Problem Definition: Planning
A MAPF-DP instance specifies an undirected environment graph and multiple agents, each with a unique start, goal, and delay probability. A plan assigns each agent a path represented as a sequence of locations over time.
Problem Definition: Planning
- The environment is an undirected graph G = (V, E), with vertices representing locations and edges representing transitions.Source: Problem Definition: Planning · p. 2
- Each of the m agents has a unique start vertex, unique goal vertex, and delay probability between 0 and 1.Source: Problem Definition: Planning · p. 2
- An agent path maps each time index from 0 through its final index to a vertex, beginning at its start and ending at its goal, with consecutive locations identical or edge-connected.A MAPF plan consists of one such path per agent.Source: Problem Definition: Planning · p. 2
Problem Definition: Plan Execution
During execution, each agent’s local state is its current time index along its path, and its policy issues GO or STOP commands. Move actions may fail with the agent remaining in place, while waits do not fail; the objective is a small expected makespan.
Problem Definition: Plan Execution
- An agent’s local state tracks its time index along its path, and its policy maps its knowledge, including received messages, to GO or STOP.Source: Problem Definition: Plan Execution · p. 2
- A GO command advances past a wait action without failure, while a move can fail with probability p_i and leave the agent in its current vertex; STOP also leaves it there.Successful moves advance the local state; wait actions never fail.Source: Problem Definition: Plan Execution · p. 2
- The execution objective is to minimize average makespan, defined as the expected earliest time when all agents have entered their last local states.When all delay probabilities are zero and policies always issue GO, MAPF is a special case.Source: Problem Definition: Plan Execution · p. 2
Valid MAPF-DP Plans
A valid MAPF-DP plan imposes vertex constraints across both agents’ current and next local states, which are necessary for collision-free execution even when moves are delayed.
- A valid MAPF-DP plan never schedules two agents in the same vertex at the same time index.Source: Valid MAPF-DP Plans · pp. 2–3
- It also prevents an agent’s next vertex from matching another agent’s current vertex, guarding against collisions when a delayed agent fails to leave.This condition is also necessary to avoid edge collisions under perfect or imperfect execution.Source: Valid MAPF-DP Plans · pp. 2–3
- A plan valid for MAPF can fail the MAPF-DP conditions when one agent’s next vertex is another agent’s current vertex.The example has l2(1) = l1(0) = v3, violating the second property.Source: Valid MAPF-DP Plans · p. 3
Robust Plan-Execution Policies
The paper presents decentralized robust execution policies for valid MAPF-DP plans, including synchronized and minimal-communication approaches, and establishes their robustness and freedom from deadlock.
Robust Plan-Execution Policies
- Both Fully Synchronized Policies and Minimal Communication Policies are decentralized robust policies that prevent collisions when executing valid MAPF-DP plans imperfectly.Source: Robust Plan-Execution Policies · p. 3
Fully Synchronized Policies (FSPs)
- Fully Synchronized Policies let an agent proceed only after every other agent has advanced beyond preceding local states, but can cause unnecessary waiting and many messages.Agents send one another messages on entering new local states.Source: Fully Synchronized Policies (FSPs) · p. 3, Minimal Communication Policies (MCPs) · p. 3
Minimal Communication Policies (MCPs)
- Minimal Communication Policies encode critical cross-agent dependencies as a partial order, then use its transitive reduction to minimize cross-agent messages.In the example, agent a2 waits at local state 3 for one message from a1, then proceeds without further waiting.Source: Minimal Communication Policies (MCPs) · pp. 3–4, Figure 2 · p. 4, Figure 3 · p. 4
Properties of FSPs and MCPs
- Both policy classes avoid deadlock and are robust because valid-plan properties constrain the order in which agents can enter shared vertices and traverse edges.The paper sketches proofs that MCPs prevent vertex and edge collisions during execution.Source: Properties of FSPs and MCPs · p. 4
Approximate Minimization in Expectation
AME uses a two-level CBS-based search to generate valid MAPF-DP plans whose execution with MCPs results in small average makespans. It approximates expected completion-time maxima to prioritize plans.
Approximate Minimization in Expectation
- AME combines valid MAPF-DP plans with MCPs to target small average makespans, approximating expectation-of-maximum completion times with maxima of expectations.The authors report that this approximation typically underestimates the expectation but is close in their experiments.Source: Approximate Minimization in Expectation · p. 4
High-Level Search
- The high-level search branches on the earliest conflict, adding constraints to separate the agents’ locations and replanning for the constrained agent.Each node stores constraints, a labeled plan, and an approximate-makespan priority key.Source: High-Level Search · p. 5
Low-Level Search
- The low-level search plans over vertex–local-state pairs, using expected action times and other agents’ labels to estimate arrival times.Its two phases first seek a path within the parent node’s makespan key with few conflicts, then seek a small approximate arrival time; it succeeds upon reaching the goal without a later goal constraint.Source: Low-Level Search · pp. 5–6
Future Work
- The authors identify the low-level search as AME’s weakest component because runtime considerations require many approximations.They suggest updating other agents’ approximate time labels as one way to improve accuracy.Source: Future Work · p. 6
Experiments
The experiments compare AME with other solvers and test how delay ranges, agent counts, and execution policies affect performance. AME appears to find lower-makespan plans than the comparison solvers, handles increasing agent counts, and MCPs balance makespan, communication, and collision prevention.
Experiment 1: MAPF Solvers
- AME seems to find smaller average makespans than Adapted CBS, which seems to outperform Push and Swap; AME and Push and Swap also seem faster than Adapted CBS.Adapted CBS did not solve instances with more than 35 agents within the five-minute limit, while AME and Push and Swap appeared to scale to larger instances.Source: Experiment 1: MAPF Solvers · p. 6, Table 1 · p. 7
Experiment 2: Delay Probability Ranges
- As delay-probability ranges increase, AME runtimes and both approximate and observed average makespans tend to rise, with noisy observed results.The difference between AME's approximate and observed average makespans also grows but remains reasonable.Source: Figure 5 · p. 7, Table 2 · p. 7, Experiment 2: Delay Probability Ranges · p. 7
Experiment 3: Numbers of Agents
- AME solves most tested instances with 50 agents and then degrades gracefully as the number of agents increases.The measures are averaged over instances solved within a five-minute runtime limit.Source: Table 3 · p. 7, Experiment 3: Numbers of Agents · p. 7
Experiment 4: Plan-Execution Policies
- MCP average makespans seem only slightly larger than those with collision-prone dummy policies, and MCP makespans and message counts seem lower than with FSPs.Dummy policies do not prevent collisions; the reported comparisons use averages over 1,000 plan-execution runs with 95%-confidence intervals.Source: Experiment 4: Plan-Execution Policies · p. 7
Conclusions
The paper formalizes MAPF with delay probabilities and develops AME and MCPs to generate and execute valid plans with small average makespans and without collisions.
Conclusions
- The conclusion presents AME as a two-level solver for generating valid MAPF-DP plans and MCPs as decentralized robust policies for executing them without collisions.The cited table covers 18 solved instances from Experiment 1 and different plan-execution policies.Source: Conclusions · p. 7, Table 4 · p. 8