Source-linked AI summary

STORE: Security Threat Oriented Requirements Engineering Methodology

Md Tarique Jamal Ansari, Dhirendra Pandey, Mamdouh Alenezi

arXiv:1901.01500v1cs.SE

TL;DR

Inadequate early security requirements engineering can leave software vulnerable and security specifications incomplete or disorganized. STORE is a ten-step, threat-oriented methodology that analyzes security threats to elicit requirements. The authors report that it elicited more effective and efficient requirements than SQUARE and MOSRE, and validated it in an ERP case study.

  • Problem

    Security concerns are often neglected early, and security requirements approaches may omit stakeholders or produce incomplete, disorganized specifications.

    Source: §1 · pp. 1–2
  • Method

    STORE uses a ten-step security requirements process, including analysis of four points for security attacks and identification of potential threats.

    Source: §3.2 · p. 5, §3.2.6 · p. 7
  • Results

    The authors report that STORE elicited more effective and efficient security requirements than SQUARE and MOSRE and validated the methodology in an ERP case study.

    Source: §5 · p. 10, §6 · p. 11
  • Takeaways & Limitations

    The authors conclude that STORE is easy to adopt and helps engineers elicit security requirements in a more organized manner.

    Source: §6 · p. 11

    A suitably accurate assessment requires a real project; the authors plan to apply STORE to more projects.

    Source: §6 · p. 12

Abstract

from arXiv · show

As we are continuously depending on information technology applications by adopting electronic channels and software applications for our business, online transaction and communication, software security is increasingly becoming a necessity and more advanced concern. Both the functional and non-functional requirements are important and provide the necessary needs at the early phases of the software development process, specifically in the requirement phase. The aim of this research is to identify security threats early in the software development process to help the requirement engineer elicit appropriate security requirements in a more systematic manner throughout the requirement engineering process to ensure a secure and quality software development. This article proposes the STORE methodology for security requirement elicitation based on security threats analysis, which includes the identification of four points: PoA, PoB, PoC and PoD for effective security attack analysis. Further, the proposed STORE methodology is also validated by a case study of an ERP System. We also compare our STORE methodology with two existing techniques, namely, SQUARE and MOSRE. We have shown that more effective and efficient security requirements can be elicited by the STORE methodology and that it helps the security requirement engineer to elicit security requirements in a more organized manner.

1. Introduction

The introduction argues that security requirements must be considered early, but existing practices can leave stakeholder concerns and security needs inadequately addressed. It presents STORE as a systematic, threat-oriented methodology for eliciting security requirements.

1. Introduction

  • Poorly built software can expose vulnerabilities to exploitation, and inadequate security requirements engineering is identified as one contributor to poor-quality products.The paper argues that security concerns should therefore be addressed from early development phases.Source: §1 · p. 1
  • Stakeholders can identify system assets, whose vulnerabilities may be exploited by threats; engineers categorize and prioritize threats before selecting mitigating security mechanisms.Source: §1 · p. 2
  • Security requirements are often handled separately from functional requirements, while existing approaches may omit significant stakeholders and use weak stakeholder-identification and prioritization practices.The introduction also characterizes security specifications as potentially incomplete, confusing, conflicting, or difficult to validate and use.Source: §1 · p. 2
  • STORE is presented as a ten-step, threat-oriented methodology intended to elicit effective, complete, clear, consistent, organized, feasible, current, and readily validated security requirements.The paper says it is especially suitable for software products requiring security from the beginning of development.Source: §1 · p. 2

2. Related work

The related-work section surveys approaches that integrate security into requirements engineering through reuse, modeling, threat analysis, stakeholder analysis, and other techniques. It identifies stakeholder coverage and general threat analysis as areas distinguishing STORE's stated focus.

2. Related work

  • SIREN reuses requirements to shorten development, while UMLsec and SecureUML-related approaches incorporate security information or access-control requirements into models.Source: §2 · p. 3
  • SQUARE provides a nine-step process for eliciting, categorizing, prioritizing, documenting, and evaluating security requirements in early development.Source: §2 · p. 3
  • Other approaches use misuse cases, threat modeling, or security use cases to identify threats and derive security requirements (Sindre and Opdahl, 2005; Myagmar et al., 2005; Firesmith, 2003; Firesmith, 2004a,b; Firesmith, 2005).The surveyed work also includes CLASP's structured resource walk-through for security services.Source: §2 · p. 3
  • MOSRE uses use-case diagrams to identify, quantify, and rank risks from security threats and vulnerabilities, and was applied to E-Health web applications.Source: §2 · p. 4
  • The review says stakeholder views are addressed by only some approaches, while STORE includes stakeholder security interests, threat-agent identification, and risk analysis.It also notes that SecureUML focuses on access control, leaving general threat analysis outside its scope.Source: §2 · p. 4

3. Proposed approach

STORE is a ten-step, threat-oriented process for eliciting and documenting security requirements early in development. It moves from goals, stakeholders, and assets through attack and risk analysis to requirements validation and specification.

3.1. Security Threat Oriented Requirements Engineering (STORE) methodology

  • STORE is a ten-step sequential process for eliciting and documenting security requirements for software and web applications early in development.It considers stakeholder security interests and includes threat-agent identification and risk analysis.Source: §3.1 · p. 4

3.2.1. Step 1. Identify system goals; 3.2.2. Step 2. Identify and prioritize stakeholders

  • System goals are elicited from the client, while stakeholders are identified and prioritized because their security needs and constraints can differ or conflict.Goals can be identified through interviews or brainstorming; stakeholders may be classified as critical, major, or minor.Source: §3.2.1 · pp. 5–6, §3.2.2 · p. 6

3.2.3. Step 3. Agreed upon goals; 3.2.4. Step 4. Asset identification

  • Requirement engineers and stakeholders agree on and document the system goals before asset identification.Assets are identified with stakeholder input, viewed from both stakeholder and attacker perspectives, then categorized and prioritized by confidentiality, integrity, and availability.Source: §3.2.3 · p. 6, §3.2.4 · p. 6

3.2.5. Step 5. Security attack analysis

  • Security attack analysis examines four points—PoA, PoB, PoC, and PoD—to identify potential attacks relevant to security requirements.PoA is an entry point such as a login page; PoB concerns external entities and their access rights; PoC concerns future security issues; PoD concerns external dependencies whose inconsistency may expose attack paths.Source: §3.2.5 · p. 6, §3.2.5.1 · p. 6, §3.2.5.2 · p. 6

3.2.6. Step 6. Threat identification and categorization

  • Threat identification considers probable threats, uses threat modeling and a threat dictionary, and categorizes threats with Microsoft’s STRIDE model.The dictionary associates previously identified threats with corresponding security requirements.Source: §3.2.6 · p. 7

3.2.7. Step 7. Risk evaluation and prioritization

  • Threats are evaluated and ranked by risk, with lower-risk threats potentially ignored when mitigating every threat is infeasible or uneconomical.The described risk formula is probability multiplied by damage potential; the method also discusses DREAD, OCTAVE, and CVSS.Source: §3.2.7 · p. 7

3.2.8. Step 8. Security requirements elicitation; 3.2.9. Step 9. Security requirements validation

  • Security requirements are elicited for identified threats in order of higher, average, then lower risk, using the threat dictionary as a knowledge source.The following validation step concerns requirements for mitigating threats, while noting that not every threat requires mitigation.Source: §3.2.8 · p. 7, §3.2.9 · p. 7

3.2.10. Step 10. Security requirements specification document

  • The final step produces a security requirements specification document, validated with stakeholders and submitted to the development team for early integration.The specification may collect stakeholder viewpoints through categorical dialogue.Source: §3.2.10 · pp. 7–8

4.1. Enterprise resource planning (ERP) system

The authors apply STORE before development to a college ERP web application that manages institutional records and holds confidential information.

4.1. Enterprise resource planning (ERP) system

  • The college ERP web application manages student, department, faculty, library, and other information, including confidential information requiring security.STORE was applied before development to elicit the software’s security requirements.Source: §4.1 · p. 8
  • The case study presents pre-development requirements elicitation as a way to identify the security requirements needed for the ERP software.The passage notes that eliciting all requirements before development is not easy, but says STORE makes it easier for the requirement engineer.Source: §4.1 · p. 8
  • The ERP system is described as integrating organizational business processes and sharing common data and practices across the enterprise.The passage also notes its real-time information capabilities and browser/web-server architecture context.Source: §4.1 · p. 8

4.2. Execution of the case study

The ERP case study follows STORE’s sequential steps to support security requirements engineering.

4.2.1. Step 1. Identify system goals

  • The first step collects college ERP system goals, using techniques such as interviews or brainstorming.The case study presents the identified goals in Table 3.Source: §4.2.1 · p. 8, Table 3 · p. 8

4.2.2. Step 2. Identify and prioritize stakeholders

  • STORE identifies and prioritizes stakeholders associated with ERP development, then seeks agreement between stakeholders and requirement engineers on the system goals.The case study lists possible stakeholders and their significance in Table 4.Source: §4.2.2 · p. 8, Table 4 · p. 8, §4.2.3 · p. 8

4.2.4. Step 4. Asset identification

  • The methodology identifies assets of the college ERP system for protection from threats.Examples include login credentials, student personal data, backend database access, and student fee and staff salary records.Source: §4.2.4 · p. 8, §4.2.5 · p. 9

4.2.5. Step 5. Security attack analysis

  • After identifying assets, STORE analyzes potential security attacks to help identify important threats.The case study organizes attack analysis around Point of Attack (PoA), Point of Belief (PoB), Point of Conjecture (PoC), and Point of Dependency (PoD).Source: §4.2.5 · pp. 8–9

4.2.6. Step 6. Threat identification

The case study identifies potential threats for each asset after asset identification and security attack analysis.

4.2.6. Step 6. Threat identification

  • After identifying assets and analyzing security attacks, STORE identifies potential threats for each asset.The case study presents recognized threats to a college ERP system in Table 10.Source: §4.2.6 · p. 9

4.2.7. Step 7. Risk Evaluation and prioritization

STORE evaluates and prioritizes threat risk, then elicits security requirements for identified threats.

4.2.7. Step 7. Risk Evaluation and prioritization

  • STORE’s risk assessment calculates threats’ impact on assets and evaluates the degree of risk to each asset.The case study lists identified threats with their risk values in Table 11.Source: §4.2.7 · p. 9

4.2.8. Step 8. Security requirements elicitation

  • The methodology elicits security requirements for each identified potential threat.The case study’s examples include creating and logging out of an authorized-person login, and storing or retrieving user data.Source: §4.2.8 · p. 9

4.2.9. Step 9. Security requirement validation

STORE validates the college ERP system’s elicited security requirements with requirement engineers and concerned stakeholders.

4.2.9. Step 9. Security requirement validation

  • Requirement engineers and concerned stakeholders validate prioritized security requirements through review or walk-through approaches.Requirements are prioritized based on the potential risk of their associated threat.Source: §4.2.9 · p. 10

4.2.10. Step 10. Security requirements specification document

STORE’s final step organizes the recognized and validated security requirements for the college ERP system in a specification document.

  • The final step documents all recognized and validated security requirements for the college ERP system in an organized specification.Source: §4.2.10 · p. 10
  • The specification is for a web-based college ERP application.Source: §4.2.10 · p. 10
  • The document is intended to assist development of a more secure, quality ERP system from the beginning.Source: §4.2.10 · p. 10

5. Result and discussion

The authors compare STORE with SQUARE and MOSRE, reporting that it elicits more effective and efficient security requirements. In both case studies, STORE covers more threats and produces more complete requirements.

5. Result and discussion

  • STORE’s comparison with SQUARE and MOSRE reports more effective and efficient security requirements when its steps are followed sequentially.Source: §5 · p. 10

5.1. Comparison with the SQUARE methodology

  • STORE covers more threats than SQUARE and elicits more complete security requirements for the asset management system.Source: §5.1 · p. 10

5.2. Comparison with the MOSRE framework

  • STORE covers more threats than MOSRE and elicits more complete security requirements for the E-Health system.Source: §5.2 · p. 10

6. Conclusion

STORE integrates threat analysis with requirements engineering to identify and prioritize threats and elicit security requirements systematically. The authors report an ERP case-study validation, while noting that the method has not yet been validated on a large project.

  • STORE integrates security with requirements engineering, identifying and prioritizing potential threats to elicit appropriate requirements systematically.Source: §6 · p. 11
  • Analyzing the four security-attack points PoA, PoB, PoC, and PoD makes threat identification easier.Source: §6 · p. 11
  • The elicited requirements include access control, authentication, encryption, account lockout, strong passwords, firewalls, and HIPAA security standards.Source: §6 · p. 11
  • A threat dictionary links previously identified threats with corresponding security requirements, and STORE was applied to a college ERP case study.Source: §6 · p. 11
  • STORE has not yet been validated on a large project; the authors say a real project is needed for a suitably accurate assessment.Source: §6 · pp. 11–12
Loading 1901.01500v1…