Source-linked AI summary

Balancing Wildfire Risk and Power Outages through Optimized Power Shut-Offs

Noah Rhodes, Lewis Ntaimo, Line Roald

arXiv:2004.07156v3eess.SYcs.SY

TL;DR

Wildfire shut-offs can reduce ignition risk but also disrupt electricity delivery, and operational decisions need to balance both. This paper formulates an optimization for selecting de-energized components and reports that it serves more load at lower wildfire-risk values than a threshold-based heuristic.

  • Problem

    Existing wildfire-risk operations leave utilities with few short-term mitigation options, and prior grid-operation work has not addressed actively preventing ignitions while accounting for load delivery.

    Source: §I · pp. 1–2
  • Method

    The optimal power shut-off problem combines component-level wildfire-risk values with load delivery in an optimization framework for short-term grid operations.

    Source: §I · p. 2, §VII · p. 9
  • Results

    The optimal shut-off problem serves more load at lower wildfire-risk values than the threshold-based heuristic.

    Source: §VII · p. 9
  • Takeaways & Limitations

    Highly loaded lines can remain energized at higher wildfire-risk values, while less loaded lines are shut off at lower risk values.

    Source: §VII · p. 9

    The authors call for a more detailed wildfire-risk model reflecting current weather and a multi-period formulation to optimize risk and load delivery over several days.

    Source: §VII · pp. 9–10

Abstract

from arXiv · show

Electric grid faults can cause catastrophic wildfires, particularly in regions with high winds and low humidity. In real-time operations, electric utilities are often left with few options for wildfire risk mitigation, leading to use of disruptive measures such as proactive de-energization of equipment, frequently referred to as public safety power shut-offs. Such power shut-offs have significant impacts on customers, who experience power cuts in an attempt to protect them from fires. This work proposes the optimal power shut-off problem, an optimization model to support short-term operational decision making in the context of extreme wildfire risk. Specifically, the model optimizes grid operations to maximize the amount of power that can be delivered, while proactively minimizing the risk of wildfire ignitions by selectively de-energizing components in the grid. This is the first optimization model to consider how preventive wildfire risk measures impact both wildfire risk \emph{and} power systems reliability at a short-term, operational time-frame. The effectiveness of the method is demonstrated on an augmented version of the RTS-GMLC test case, located in Southern California, and compared against two approaches based on simple risk thresholds. The proposed optimization-based model reduces both wildfire risk and lost load shed relative to the benchmarks.

I. INTRODUCTION

Wildfire-risk operations must balance ignition prevention against reliable electricity delivery. The paper proposes a targeted shut-off optimization that considers both component risk and the load lost when equipment is de-energized.

I. INTRODUCTION

  • De-energization can eliminate ignition risk from a line, but widespread shut-offs disrupt electricity service and can affect customers’ health.At their October 2019 peak, shut-offs turned off power to almost a million customer accounts.Source: §I · p. 1
  • The optimization framework aims to maintain as much load delivery as possible while minimizing wildfire risk, addressing a gap in operational models focused on actively preventing fires.The authors describe it as the first model for supporting public safety power shut-off decisions in this setting.Source: §I · p. 2
  • The model weighs wildfire risk against delivered load using a DC power flow representation and a risk parameter α, and is evaluated against two benchmarks on an augmented RTS-GMLC case.The case study adds wildfire-risk data to the test system.Source: §I · p. 2

II. WILDFIRE RISK AND ELECTRIC GRIDS

  • High winds can increase both power-line fault likelihood and fire spread, motivating proactive de-energization despite its disruption to service.The paper frames this as a short-term operational trade-off.Source: §II · p. 2

A. Modelling Risk of Wildfire Ignitions

The section frames wildfire risk as more than ignition likelihood and explains why existing regional assessments need adaptation for grid operations. It then develops a local component-risk measure based on ignition probability and operator information.

A. Modelling Risk of Wildfire Ignitions

  • Wildfire risk combines ignition probability, the chance an ignition becomes a fire, fire size and intensity, and resulting damage.The likelihood of a fire and its consequences depend on local conditions such as vegetation, humidity, topology, and weather.Source: A. Modelling Risk of Wildfire Ignitions · p. 2

1) Traditional Wildfire Risk Assessment:

  • Traditional assessments provide relative regional threat and damage information for long-term planning, but often account for ignition sources only implicitly.The authors argue these tools must be adapted to estimate ignition-risk reductions from grid infrastructure.Source: 1) Traditional Wildfire Risk Assessment · p. 3

2) Wildfire Risk of Electric Components:

  • The component-risk model combines area risk Rj with a relative ignition factor κe,j, which operators can adjust using equipment and weather information.The model assumes high-voltage equipment is the dominant ignition source in its immediate area; κ = 1.0 is the baseline, while values above or below one indicate elevated or reduced ignition risk.Source: 2) Wildfire Risk of Electric Components · p. 3
  • The risk model is local: it does not capture a fire spreading from one area to adjacent areas.The authors distinguish this from mitigation of fire spread, which they say utilities do not control in the same way as ignition prevention.Source: 2) Wildfire Risk of Electric Components · p. 3

3) Short-Term Mitigation of Wildfire Risk:

Short-term mitigation is modeled as a choice about which equipment remains energized and how much load is shed. De-energizing a component removes its ignition risk, while the formulation tracks component status and total system risk.

3) Short-Term Mitigation of Wildfire Risk:

  • De-energizing equipment reduces its modeled wildfire risk to zero, making the energized-or-de-energized choice a decision about accepted risk.The authors contrast this short-term option with inspections and vegetation management, which take time to plan and implement.Source: 3) Short-Term Mitigation of Wildfire… · pp. 3–4
  • Generators, lines, and buses use binary energized-status variables, while load shedding is a continuous fraction of each modeled load.The load fraction also represents the corresponding distribution infrastructure that is de-energized.Source: 3) Short-Term Mitigation of Wildfire… · p. 4
  • Total component wildfire risk is expressed in the risk map’s units, which may be approximate relative scales rather than detailed numerical measures.The authors connect this coarseness to the difficulty of assigning numerical values to fire’s economic and societal impacts.Source: 3) Short-Term Mitigation of Wildfire… · p. 4

B. Modelling Risk of Power Shut-Offs

The model measures service by load delivered rather than a detailed monetary estimate of outage impacts, and weights loads to allow priority for essential services. It frames short-term operator decisions as a trade-off between load delivery and wildfire risk.

B. Modelling Risk of Power Shut-Offs

  • Load delivery is maximized without monetizing outage impacts, while weights allow hospitals and other essential services to be prioritized.The amount of load delivered is the service measure.Source: B. Modelling Risk of Power Shut-Offs · p. 4

C. Trading off Risk of Wildfires and Power Shut-Offs

  • Parameter α trades off serving more load at low values against avoiding wildfire risk at high values.Solving across α yields a Pareto front of optimal load-delivery and wildfire-risk trade-offs for operators to choose from.Source: C. Trading off Risk of Wildfires and… · p. 4

III. OPTIMAL POWER SHUT-OFFS

  • The optimization supports short-term operational decisions, from a few days ahead through real time, about which components to keep energized.Decision variables include component energization, generator output, line flows, and voltage angles.Source: §III · p. 4

1) Component interactions:

The model links equipment energization to bus status, enforces generator operating limits, and represents network flows and load balance with DC power-flow constraints.

1) Component interactions:

  • Generators, loads, and lines can be energized only when their connected buses are energized.The model enforces these component-to-bus relationships through constraints.Source: 1) Component interactions · p. 4

2) Generators:

  • Generator constraints set output to zero when a generator is off and otherwise enforce its minimum and maximum generation limits.Source: 2) Generators · p. 4

3) Power flow representation and transmission limits:

  • The DC power-flow constraints enforce line-flow limits when energized, zero flow when de-energized, and nodal balance accounting for shed load.For an energized line, its flow follows the standard DC power-flow constraint and stays within its thermal limit.Source: 3) Power flow representation and… · pp. 4–5

4) Optimal Power Shut-Off Problem:

The OPS formulation is a mixed-integer linear program, while the benchmarks use wildfire-risk thresholds to choose components for shut-off before maximizing load served.

4) Optimal Power Shut-Off Problem:

IV. BENCHMARK METHODS

  • Both benchmark heuristics first shut off components using wildfire-risk thresholds, then maximize load served with those components unavailable.The benchmarks differ in how the risk threshold is applied.Source: §IV · p. 5

A. Step 1: Component shut-off

  • The area heuristic shuts off all components in an area above its total-risk threshold, whereas the transmission heuristic deactivates lines exceeding an individual-risk threshold.Neither heuristic directly shuts down loads, generators, or buses except when they must be disconnected.Source: A. Step 1: Component shut-off · p. 5

B. Step 2: Maximize Load Delivery

After heuristic shut-offs, a maximum-load-delivery problem handles network feasibility and additional load shedding. Unlike OPS, this two-step approach separates risk-based shut-offs from load maximization.

B. Step 2: Maximize Load Delivery

  • The maximum-load-delivery formulation accommodates islands and further component disabling when outages make ordinary optimal power flow infeasible.It can disable isolated generators or shed additional load when needed.Source: B. Step 2: Maximize Load Delivery · p. 5
  • After load delivery is solved, post-processing disables network islands with no attached load.Source: B. Step 2: Maximize Load Delivery · p. 5
  • The heuristics choose shut-offs solely by wildfire risk and then maximize load, whereas OPS jointly considers risk reduction and load shed.The separate load-maximization problem does not consider wildfire risk and may leave energized components that are unnecessary for serving load.Source: B. Step 2: Maximize Load Delivery · p. 5

V. CASE STUDY: IMPLEMENTATION AND SETUP

The study implements OPS and its heuristics, then tests them on a geographically specified RTS-GMLC case with assigned wildfire-risk values and component ignition assumptions.

A. Implementation

  • The OPS and maximum-load-delivery problems are mixed-integer linear programs, solved in under 0.5 seconds and 0.05 seconds, respectively.The implementation uses Julia v1.4 and Gurobi v8.1 on a 12-thread Intel CPU with 16 GB of memory.Source: A. Implementation · p. 6

B. System model with wildfire risk

  • The test case starts from the 73-bus RTS-GMLC system, omits its HVDC line, and places the network across Southern California, Nevada, and western Arizona.Its artificial risk map is inspired by a Southern California map from October 2019.Source: B. System model with wildfire risk · p. 6
  • The model assigns risk values of 0.0, 1.0, 2.0, and 4.0 to low-, medium-, high-, and extreme-risk zones, respectively.These zone values are associated with components and their assumed fault probabilities.Source: B. System model with wildfire risk · p. 6
  • Generators, buses, and loads use an assumed ignition probability of 1; load risk weights are also set to 1.The text notes that load size alone may not capture differences in ignition probability between urban and rural distribution systems.Source: B. System model with wildfire risk · p. 6
  • Transmission-line ignition risk varies with voltage and length: each 10 km segment is assigned a risk zone, with κ=1.0 for 230 kV lines and κ=2.0 for 138 kV lines.The lower-voltage lines are assumed to have higher ignition probability relative to the higher-voltage lines.Source: B. System model with wildfire risk · p. 6

VI. CASE STUDY: NUMERICAL RESULTS

The Pareto comparison finds that OPS achieves lower wildfire risk than the heuristics at equal load delivery, while showing how risk and delivered load change with operating parameters.

VI. CASE STUDY: NUMERICAL RESULTS

  • OPS is evaluated across α values from 0 to 1 in 0.01 steps to produce a Pareto curve, while the transmission heuristic is swept across Rmax thresholds.The study also compares the area heuristic's single operating point and standard operation with all components energized.Source: §VI · pp. 6–7

A. Pareto Front

  • At equal load delivery, OPS consistently achieves lower wildfire risk; the area heuristic has both higher risk and more load shed than the other methods.The comparison covers OPS, the transmission heuristic, and the area heuristic.Source: Figure 2 · p. 7, A. Pareto Front · p. 7
  • At α=0.25, OPS reaches very low but non-zero risk while serving approximately 75% of system load.As α decreases further, delivered load falls slowly before dropping to zero at α=1.0, when all equipment is turned off.Source: A. Pareto Front · p. 7
  • For the transmission heuristic, lowering Rmax from 70 to 20 keeps load delivery relatively high while reducing wildfire risk to less than half its original value.Below Rmax=20, both wildfire risk and delivered load decrease.Source: A. Pareto Front · p. 7
  • At α=1.0, OPS turns off the entire system, eliminating risk but serving no load.The transmission heuristic likewise serves no load when Rmax=0.Source: A. Pareto Front · p. 7

B. Operation Schemes

The selected operation schemes compare wildfire risk and load delivery across medium- and low-risk settings, with OPS serving more load than the transmission heuristic in the medium-risk comparison.

B. Operation Schemes

  • The selected medium-risk settings are α=0.01 for OPS and Rmax=18.9 for the transmission heuristic; the low-risk settings are α=0.15 and Rmax=0.0021, respectively.The area heuristic uses a regional threshold of Rmax=30.0.Source: B. Operation Schemes · p. 7

1) Medium-Risk Operation Schemes:

  • The medium-risk OPS topology sheds only 10 MW and forms a near-radial, tree-like network, while the transmission heuristic disables western lines and isolates some loads.OPS disables more components in lower-risk zones to preserve near-full load delivery, but removes redundancy.Source: 1) Medium-Risk Operation Schemes · p. 8, Figure 3 · p. 8
  • The medium-risk OPS solution is no longer N-1 secure because it removes redundancy to reduce wildfire risk.The text describes the resulting reliability impact as preferable to an intentional blackout.Source: 1) Medium-Risk Operation Schemes · p. 8
  • Both medium-risk methods cut wildfire risk by 50%: OPS served 8540 MW (10 MW shed), versus TH's 8220 MW (330 MW shed), from 8550 MW under standard operation.The two scenarios have similar wildfire risk, while OPS serves more load.Source: 1) Medium-Risk Operation Schemes · pp. 7–8, Table I · p. 8

2) Low-Risk Operation Schemes:

At comparable low-risk levels, the optimal power shut-off reduces load shed relative to the transmission heuristic. Its component-aware choices distinguish it from less targeted shutdown strategies.

2) Low-Risk Operation Schemes:

C. Optimal Power Shut-Off Solutions

2) Low-Risk Operation Schemes:

  • At comparable risk levels, the optimal power shut-off reduces load shed by 25% relative to the transmission heuristic.Source: 2) Low-Risk Operation Schemes · p. 9
  • Both low-risk approaches shut down almost all components in the high-risk western region and island some grid regions, while the optimized strategy favors components with lower load-delivery impact.Source: 2) Low-Risk Operation Schemes · p. 9
  • The low-risk islanding result assumes generators can operate stably in separate islands and the grid can later be resynchronized.Source: 2) Low-Risk Operation Schemes · p. 9

3) The value of a targeted approach:

  • The area heuristic uses a regional threshold, the transmission heuristic considers individual line risk, and the optimization also accounts for components’ impact on serving load.Source: 3) The value of a targeted approach · p. 9

C. Optimal Power Shut-Off Solutions

VII. CONCLUSIONS AND FUTURE WORK

The conclusion presents an optimization approach that balances wildfire risk against load delivery, reporting more load served at lower risk than threshold-based heuristics. It frames the model as an initial step and outlines future work on risk modeling, reliability, distribution-grid detail, and longer-term planning.

  • The optimal power shut-off problem serves more load at lower wildfire-risk values than the threshold-based heuristic.Source: §VII · p. 9
  • Highly loaded lines remain energized at higher wildfire-risk values, while less-loaded lines are shut off at lower risk values.Source: §VII · p. 9
  • The minimum-risk network topology is tree-like and sometimes splits the system into islands.Source: §VII · p. 9
  • Future work calls for more detailed, current-weather wildfire-risk models and multi-period optimization, while retaining a fixed topology because lines require inspection before re-energization.Source: §VII · pp. 9–10
  • The optimized topology is not N-1 secure, so additional faults can significantly affect reliability and expected load delivery; future work also needs more detailed distribution-grid modeling.Source: §VII · p. 10
  • The real-time model could be extended to longer-term planning, including distributed-generation construction and identifying critical lines for wildfire mitigation.Source: §VII · p. 10
Loading 2004.07156v3…