An FPTAS for Two-Machine Open-Shop Scheduling with a Single Unavailability Interval
Hao Lu, Yuan Yuan, Xingwu Liu, Xin Han, Yong Zhou
TL;DR
The NP-hard resumable two-machine open-shop problem with one fixed maintenance period has known approximation algorithms, but whether it admits an FPTAS remained unresolved. The paper develops a seven-dimensional dynamic program and scaling-and-rounding approach, yielding the first FPTAS.
Problem
The NP-hard problem has known approximation algorithms, including a PTAS, but whether the resumable single-fixed-period variant admits an FPTAS remained open.
Source: §1 · p. 2Method
Results
The paper gives the first FPTAS, running in O(n^7/ε^6), using a seven-dimensional dynamic program rather than the earlier ten-dimensional formulation.
Source: §3 · p. 6, §5 · p. 16, §4 · p. 16Takeaways & Limitations
The conclusion leaves an FPTAS for the corresponding non-resumable problem as a direction for future work.
Source: §5 · p. 16The analysis assumes positive binary-encoded integer inputs and 0<s<a(N); the boundary cases s=0 and s≥a(N) use separate linear-time algorithms.
Source: §2 · p. 3
Abstract
from arXiv · showhide
We consider the two-machine open-shop scheduling problem in which one machine is unavailable during a fixed interval. We study the resumable setting: an operation interrupted by the unavailability interval may resume, without penalty, when the machine becomes available. The objective is to minimize the makespan. Although the problem is NP-hard and several approximation algorithms are known, whether it admits a fully polynomial-time approximation scheme (FPTAS) has remained open for two decades. We resolve this question affirmatively by giving the first FPTAS, thereby strengthening the previously known polynomial-time approximation scheme (PTAS). As an intermediate result, we develop a new pseudo-polynomial dynamic program with seven state dimensions, improving on the ten-dimensional formulation in the literature.
1 Introduction
The paper presents the first FPTAS for the resumable two-machine open-shop problem with a single fixed maintenance period. Its approach uses a seven-dimensional pseudo-polynomial dynamic program followed by scaling and rounding.
1 Introduction
- Each job has two operations that cannot overlap, and their order may be chosen independently; the fixed maintenance period occupies [s, e] on one machine.Source: §1 · p. 2
- A single fixed maintenance period makes the two-machine open-shop problem NP-hard; resumable interruptions continue without penalty after the machine becomes available.Source: §1 · p. 2
- Existing resumable results include a 4/3-approximation and PTASs for single- and multiple-period variants, while related flow-shop work has an FPTAS.Source: §1 · p. 2
- The authors give the first FPTAS for the resumable problem via a seven-dimensional pseudo-polynomial dynamic program followed by scaling and rounding.The dynamic program runs in O(nsV^5), and the FPTAS runs in O(n^7/ε^6).Source: §1 · p. 3
2 Preliminaries
The section characterizes optimal schedules through two canonical forms and a stronger ordering property that supports the dynamic program. It also specifies the fixed unavailability interval and the interior case considered.
- The unavailability interval [s, e] is on M1, with positive integer processing times and 0 < s < a(N); boundary cases s = 0 or s ≥ a(N) are solvable in O(n) time.Source: §2 · p. 3
- An optimal schedule has one of two forms: M1 orders XP/XS/YS and M2 orders YS/XP/XS, or M1 orders XP/YP/YS and M2 orders YP/YS/XP.Source: §2 · p. 4
- Interchanging jobs between XS and YP yields an optimal schedule in which either YP or XS is empty, without increasing makespan.Source: §2 · p. 4
- A canonical optimal schedule can also order XP/YP/XS/YS on M1 and YP/YS/XP/XS on M2, with identical job order within each subset.Source: §2 · p. 4
- XP and XS follow Johnson’s rule, while YP and YS follow its reverse; Johnson’s rule orders jobs by comparing min{ai, bj} values.Source: §2 · pp. 3, 6
3 A pseudo-polynomial dynamic program
The dynamic program uses seven state dimensions and runs in O(nsV^5) time. It stores an unrounded processing-time quantity to preserve feasibility after rounding, while the state variables recover the makespan.
- Seven state dimensions and O(nsV^5) running time improve on Lorigeon et al.’s ten-dimensional, O(ns^2V^7) dynamic program.Source: §3 · p. 6
- Rather than minimizing makespan directly, the program minimizes a(XP) using the original processing times.Source: §3 · p. 6
- Retaining this unrounded value after rounding preserves feasibility with respect to s, while the state variables recover the makespan.Source: §3 · p. 6
3.1 Computing the makespan from XP , XS, Y P , and Y S
For a fixed partition into XP, XS, Y P, and Y S, the makespan is determined by whether the last operation finishes on M1 or M2. The corresponding formulas account for possible idle intervals and degenerate empty subsets.
3.1 Computing the makespan from XP , XS, Y P , and Y S
- The last-operation machine determines which of two observations gives the makespan as a maximum of completion-time bounds.The proof combines the M1 and M2 cases to evaluate a fixed partition.Source: §3.1 · pp. 7, 9
- When the last operation completes on M1, the bounds capture total M1 work plus the interruption, reverse-Johnson makespans, and the post-unavailability start constraint for Y S.The formula is max{a(N) + d, Cmax(Y S), e + a(Y S)}; it remains valid when XS is empty.Source: §3.1 · p. 7
- When the last operation completes on M2, the bounds capture XP and XS flow-shop completion, the interruption between them, and total M2 work.The three bounds correspond to an idle interval between Y S and XP, an idle interval between XP and XS, or continuous M2 processing.Source: §3.1 · pp. 7–8, Figure 8 · p. 8
- For XS = ∅, the M2 completion formula remains valid because the interruption-related term is redundant when the last operation finishes on M2.The remaining possibilities are completion at b(N) or at Cmax(XP), depending on whether an idle interval separates Y S and XP.Source: §3.1 · pp. 8–9, Figure 9 · p. 8
3.2 Dynamic program
The dynamic program uses the canonical schedule structure to divide jobs among three flow-shop subproblems, then evaluates terminal states to recover an optimal schedule. Its seven state dimensions track subproblem quantities and the job index, while retaining original processing times to preserve feasibility after rounding.
3.2 Dynamic program
- Three flow-shop subproblems contribute two state variables each, and the job index makes the dynamic program seven-dimensional.The state value tracks a(Nk ∩ XP) using original processing times, while the subproblems omit the unavailability interval handled during global makespan reconstruction.Source: §3.2 · p. 10
3.2.1 Case A: Y P = ∅
- In Case A, where Y P = ∅, the recurrence assigns each Johnson-ordered job to XP, XS, or Y S using state variables for processing totals and subproblem makespans.The state value retains a(Nk ∩ XP) on original processing times so feasibility against the original bound s remains checkable after rounding.Source: §3.2 · p. 10, §3.2.1 · pp. 10–11
3.2.2 Case B: XS = ∅
- Case B corresponds to XS = ∅ and assigns each job among XP, Y P, and Y S with six subproblem coordinates plus the job index.Its state coordinates record processing totals and makespans for the three subsets; transitions (a), (b), and (c) assign jobs to XP, Y P, and Y S.Source: §3.2 · p. 10, §3.2.2 · p. 13
Part (a): assigning job k to XP.
- Assigning job k to XP updates XP’s processing-time and makespan coordinates, with the transition condition accounting for the resulting schedule boundary.The XP transition is described by recurrence (a), and the boundary case uses Observation 5 to delay preceding jobs on M2.Source: §3.2.1 · p. 11, Part (a): assigning job k to XP · p. 11
Part (b): assigning job k to XS.
- Assigning job k to XS updates XS’s state coordinates using the same boundary argument as the XP assignment.The recurrence assigns job k to XS through transition (b).Source: §3.2.1 · p. 11, Part (b): assigning job k to XS · p. 12
Part (c): assigning job k to Y S.
- When job k is assigned to Y S, it is the last job in that subset to begin processing.The Y S assignment is transition (c) in Case A.Source: §3.2.1 · p. 11, Part (c): assigning job k to Y S · p. 12
3.2.3 Makespan
- After all jobs are processed, feasible terminal states are evaluated using the case-specific makespan propositions, and backtracking recovers the partition and schedule.The selected partition is combined with the prescribed Johnson orders.Source: §3.2.3 · pp. 13–14
4 FPTAS
Scaling and rounding the dynamic program yields an FPTAS for the resumable two-machine open-shop problem. Retaining original processing times in the value function preserves feasibility when the rounded schedule is mapped back to the original instance.
- The rounded instance floors each processing time and the interval start after scaling by δ; the algorithm runs the rounded dynamic program and backtracks from a minimum-makespan terminal state.Source: §4 · pp. 14–15
- Although state coordinates are rounded, transition (a) adds the original processing time, keeping the condition f_n ≤ s valid after mapping the schedule back.Source: §4 · p. 15
- Each rounded time parameter differs from its scaled counterpart by less than one, while a critical completion-time expression contains at most n + 1 operation lengths and one unavailability interval.Source: §4 · p. 15
- Rounding down cannot increase makespan, and the lower bound satisfies LB ≥ OPT/2.Source: §4 · pp. 14–15
- The rounded dynamic program has O(n(V^0)^6) states and runs in O(n^7/ε^6) time, so Algorithm FP is an FPTAS.Source: §4 · pp. 15–16
5 Conclusion
A four-way job partition lets a compact collection of flow-shop states recover the makespan, yielding a seven-dimensional pseudo-polynomial dynamic program and the first FPTAS for the resumable problem. Whether the corresponding non-resumable problem admits an FPTAS remains open.
- A four-way job partition lets a compact collection of flow-shop states recover the makespan, yielding a seven-dimensional pseudo-polynomial dynamic program and the first FPTAS for the resumable problem.Source: §5 · p. 16
- Whether the corresponding non-resumable problem also admits an FPTAS remains an open direction for future work.Source: §5 · p. 16