Source-linked AI summary
Adaptivity, Anchoring, and the Exact Oracle Complexity of Stochastic Fixed-Point Iterations
Yekini Shehu
TL;DR
The paper asks how anchoring affects stochastic fixed-point iteration across contraction and nonexpansive maps, including when modulus information is unavailable. It analyzes schedule tradeoffs and oracle complexity, finding a sharp Hilbert-space rate for nonexpansive maps and a lacunary exception to the deterministic schedule dichotomy.
Problem
It was unclear whether a fixed contraction-oblivious anchor schedule could be optimal for both contractions and nonexpansive maps, while exact stochastic contraction complexity depends on what modulus information is known.
Source: §1.1 · p. 2, §1 · p. 2Method
The paper analyzes anchored iterations with a single-point unbiased bounded-variance oracle, proving schedule results and reducing Hilbert nonexpansive residuals to monotone inclusions.
Source: §1 · p. 1Results
The Hilbert-space nonexpansive minimax rate is ~Θ(σ^2ε^-2 + Dε^-1), and the paper also proves an O(Kσ^2D^2ε^-4) upper bound in 2-uniformly smooth spaces.
Source: §4.2 · p. 33, §7 · p. 50Takeaways & Limitations
The schedule dichotomy fails under lacunary anchor concentration, which permits a fixed schedule to be contraction-optimal and rotation-polynomial.
Source: §3.4 · pp. 14, 19For bounded-variance noise, the factor ln(D/ε) gap between the stochastic upper and lower bounds remains unresolved.
Source: §7 · p. 52
Abstract
from arXiv · showhide
We study stochastic fixed-point iterations $x_{n+1}=\theta_nx_0+(1-\theta_n)\widehat T(x_n)$ for nonexpansive and contractive operators on Hilbert spaces, with a single-point unbiased oracle of bounded variance. Deterministically, every anchor schedule $\theta_n=c_n/(n+2)$ whose density $c_n\in(0,1]$ does not oscillate between scales is either polynomially suboptimal on contractions or super-polynomially slow on rotations; for constant densities $\theta_n=c/(n+2)$ the tradeoff is exact, with $\norm{x_n}\asymp\Gamma(c+1)(n\varphi)^{-c}$ on rotations by angle $\varphi$ ($\varphi\to0$, $n\varphi\to\infty$) and, for the classical schedule, $\norm{x_n}=\frac{2|\sin(n\varphi/2)|}{n\varphi}+O(\frac1n)$. The dichotomy fails exactly under lacunary anchor concentration: an explicit $\gamma$-oblivious schedule, one per target accuracy, is simultaneously contraction-optimal and rotation-polynomial with exponent $1/\alpha_0$, $\alpha_0=\log_2(3/2)$, and, for each fixed target accuracy, the matching lower bound holds for Lebesgue-a.e.\ angle. For stochastic contractions, the minimax rate is $\Theta(\sigma^2\eps^{-2}(1-\gamma)^{-2})$ on affine maps, and within the anchored class $\Theta(\sigma^2\eps^{-2}(1-\gamma)^{-2}+(1-\gamma)^{-1}\ln(D/\eps))$ for known modulus via geometric batching; without a certified modulus bound no sound distance certificate exists, and a certified ceiling is the exact boundary. For nonexpansive maps we prove $O(K\sigma^2D^2\eps^{-4})$ in every $2$-uniformly smooth Banach space and the Hilbert rate $\tilde\Theta(\sigma^2\eps^{-2}+D\eps^{-1})$ by reduction to monotone inclusions. Numerical experiments are consistent with every scaling prediction.
1 Introduction
The paper studies anchored fixed-point iterations with a single-point unbiased stochastic oracle and asks how anchoring affects contraction and nonexpansive problems. It establishes schedule tradeoffs, contraction oracle bounds, and nonexpansive rates, while identifying limits on distance certification without modulus information.
1.1 The three questions and our answers
- Fixed-density schedules trade contraction performance against rotation speed, while lacunary anchoring breaks the dichotomy and yields a fixed schedule that is contraction-optimal and rotation-polynomial.A parallel two-track scheme also attains the contraction and nonexpansive optima at a factor-2 evaluation cost.Source: §1.1 · pp. 2–3
- For general contractions with known modulus, geometric batching attains the exact anchored-class rate and removes the logarithmic gap left by constant-batching analyses.The batch sizes increase geometrically, and the resulting cost is the information-theoretic noise floor.Source: §1.1 · p. 3
- Without modulus information, no algorithm can produce a sound data-driven distance certificate with finite budget; a certified modulus ceiling marks the boundary for certification.Trajectory-based probes bound the contraction gap on the wrong side for converting residuals into distances.Source: §1.1 · p. 4
- For nonexpansive maps, the paper proves an O(Kσ^2D^2ε^-4) bound in 2-uniformly smooth spaces and obtains the Hilbert minimax rate by reduction to monotone inclusions.The Hilbert rate is ~Θ(σ^2ε^-2 + Dε^-1); the reduction uses that I − T is monotone and 2-Lipschitz.Source: §1.1 · p. 4
1.2 Techniques and the measurability discipline
- The stochastic analyses avoid correlation errors by expanding squared-norm recursions before norm inequalities and using deterministic coefficients or comparison paths.Conditional unbiasedness then cancels cross terms without requiring independence between parameters and noise.Source: §1.2 · pp. 4–5
1.3 Related work
- The paper addresses schedule-level separations, dichotomy boundaries, and usable modulus information as questions complementary to the algorithm-design focus of parameter-free methods.Its results do not compete with those methods' algorithmic guarantees.Source: §1.3 · p. 6
2 Setting, conventions, and the measurability discipline
The setting comprises nonexpansive and contractive instances with a shared anchor and a stochastic oracle; schedules are deterministic and do not know the contraction modulus. The analysis maintains a measurability discipline so stochastic cross terms can be controlled without assuming parameter-noise independence.
2.1 Instance classes and oracles
- The union class contains nonexpansive maps and contractions, and a schedule for it must reach the target on every instance without knowing the map or contraction factor.The anchored iteration class allows arbitrary deterministic coefficients; the paper's algorithms also lie in the span class.Source: §2.1 · pp. 6–7
- Each independent oracle call returns an unbiased evaluation with variance at most σ^2, and averaging a batch of m calls reduces per-step variance to σ^2/m at m times the oracle cost.Contraction accuracy is measured by expected distance to the unique fixed point; the nonexpansive criterion is expected residual.Source: §2.1 · p. 7
- Stochastic recursions are expanded in squared norms with deterministic coefficients or comparison paths, so conditional centering cancels cross terms without requiring parameter-noise independence.The iterate is measurable with respect to past oracle responses, while the current batch noise has conditional mean zero.Source: §2.1 · p. 7
3 Deterministic separation: small-anchor schedules and the rotation law
This section characterizes how anchor schedules separate contraction and rotation behavior, including the general dichotomy, its lacunary-concentration exception, and the associated almost-everywhere and measure-based bounds. It also examines oscillating schedules, restart and detection barriers, and when two-track or parallel composition can achieve both regimes.
3.1 Small-anchor schedules are contraction-optimal
- Choosing c = ε/(96D) gives contraction error at most 3ε/4 in N = O(ln(2D/ε)/(1−γ)) iterations, with a schedule that does not depend on γ.The proof controls total anchor contribution by O(Dc) and lets the unanchored component contract geometrically.Source: §3.1 · pp. 7, 9
3.2 The rotation law
- For c ∈ (0,1), ∥x_n∥ ≍ Γ(c+1)(nφ)^−c; at c = 1, only the upper bound and lower bound away from sine zeros are uniform.At c = 1, ∥x_n∥ ≤ (2 + o(1))(nφ)^−1 and ∥x_n∥ ≥ c|sin(nφ/2)|/(nφ) − O(1/n).Source: §3.2 · p. 10
- For every sufficiently small φ, the rotation trajectory has a lower envelope ∥x_n∥ ≥ c7 min{1,(nφ)^−c} over the stated range n0(c) ≤ n ≤ c4/φ.The result supplies a finite-range lower bound used to quantify the rotation cost in the separation theorem.Source: §3.2 · p. 12
3.3 The union-class separation theorem
- Within the constant-c family, no schedule is simultaneously contraction-optimal and rotation-polynomial, so adaptivity is necessary on the union class.For c ≤ ε/(96D), the theorem gives a contraction bound but identifies a rotation angle with a slow hitting time.Source: §3.3 · p. 13
3.4 Beyond the family: universal bounds and the dichotomy for general anchor densities
- The section states that the same separation dichotomy holds for schedules θ_n = c_n/(n+2) with arbitrary c_n ∈ (0,1], without regularity, monotonicity, or slow-variation assumptions.It also introduces a universal anchor-floor lemma, including an exact error identity for the scalar contraction instance.Source: §3.4 · p. 14
- For θ_n = c_n/(n+2), positive limiting lower density makes schedules polynomially suboptimal on contractions, while finite total anchor mass leaves sufficiently small rotations unsolved and infinite mass permits super-polynomial rotation times.In the infinite-mass case, for every B ≥ 1, some angle tending to zero with accuracy has hitting time greater than ε^-B.Source: §3.4 · p. 15
- A fixed, γ-oblivious oscillatory schedule is contraction-optimal and rotation-polynomial with exponent 1/α0 ≈ 1.71, but its residual guarantee on the full nonexpansive class remains open.Here α0 = log2(3/2); the schedule depends on the target accuracy and distance bound, but not on the contraction modulus.Source: §3.4 · pp. 16, 19
- The boundary is lacunarity: bounded gaps between dense anchor scales force the dichotomy, whereas lacunary gaps permit a schedule optimal on contractions and polynomial on rotations.For the constructed schedule, dense-anchor gaps grow as 2^j − 1; small-mass stretches support contraction dynamics, while dyadic dense blocks re-inject anchor mass.Source: §3.4 · pp. 16, 20
- At each fixed accuracy, the rotation hitting-time lower bound matches the exponent 1/α0 for Lebesgue-a.e. angle, yielding the exact rate φ^-1 ε^(-1/α0)+o(1) along a full-density set of accuracies.The schedule's rotation upper bound has exponent 1/α0, with a matching lower bound for almost every angle at each fixed accuracy.Source: §3.4 · p. 19
3.5 The metric lacunarity law
- The metric lacunarity law gives an unconditional almost-everywhere hitting-time law with exact exponent 1/α0 and a uniform law at every β < 1/α0, but no fixed-constant uniform lower envelope is proved.Explicit rates for the uniform exponents would follow from the orbit small-ball conjecture; the single-term Rouché analysis does not provide them.Source: §3.5 · p. 20
- Deep crossings below θ_n/2 ≍ 1/n are isolated, while the orbit small-ball conjecture is obstructed by comparable leading coefficients, unseparated top frequencies, and a same-order deeper-block tail.The universal pointwise law is likely false; the proposed replacement is a pointwise law for Diophantine angles, while the fixed-constant uniform envelope remains open.Source: §3.5 · pp. 20, 21, 24
- For every β < 1/α0, the bad-angle set has measure o(1), and for a.e. angle N_φ(ε) ≥ c(β, φ)φ^-1ε^-β for sufficiently small ε.An explicit decay rate for the bad-set measure, or a uniform bound reaching exponent 1/α0, remains open and would require the orbit small-ball conjecture.Source: §3.5 · pp. 22, 24
- For each fixed ε, Lebesgue-a.e. angle satisfies N_φ(ε) ≥ φ^-1 μ(φ, ε) ε^-1/α(ε), matching the upper bound up to a constant, with the bound holding on a full-density set of accuracies.Here α(ε)=α0+O(ε); the unrestricted limit over all ε→0 remains open.Source: §3.5 · pp. 22, 24
3.6 The sufficiency half: optimal escape by parallel composition, and the single-trajectory barrier
- The parallel two-track scheme has hitting time at most 1+4 ln(2D/(εγ))/ln(1/γ) on contractions and 1+2D/ε on nonexpansive maps, matching the respective optimal rates [29].It runs both tracks once per step, using a factor 2 more evaluations than a single track.Source: §3.6 · p. 25
- A single fixed oscillatory schedule achieves contraction-optimal and nonexpansive-optimal performance with no overhead, so the parallel scheme’s factor-2 evaluation cost is not necessary.The parallel construction remains the simplest sufficiency witness.Source: §3.6 · p. 25
- Every fixed schedule is slow on a single nonexpansive instance, but whether an adaptive anchored single-stream scheme can match the two-track bounds remains unresolved.The section identifies obstructions involving response-matching pairs, distinguishable angles, and one-dimensional control of the anchor.Source: §3.6 · pp. 25–26
- The deterministic parallel scheme answers Q1 as a complexity result, while its stochastic counterpart is framed through the ceiling trichotomy.The passage distinguishes this from certifying ε-accuracy from oracle data: stochastic distance certification requires a certified ceiling.Source: §3.6 · p. 26
- Doubling-window restarts reach contraction distance ε in O(D/(εδ)) iterations, matching the classical schedule’s order but not the O(ln(D/ε)/δ) optimum.Within each window, distance contracts by a factor 1/(δL_k), while window lengths double; the stated bound improves the constant, not the order.Source: §3.6 · p. 27
- Single-trajectory modulus detection is obstructed by hidden directions with exact responses and by noise-correlated angle estimates with a stochastic oracle.The passage states that exact-oracle probing cannot certify the global modulus in infinite dimensions; the stochastic two-regime problem is settled up to factor 2 by parallel composition, while the single-stream stochastic version remains open.Source: §3.6 · pp. 27–28
- With bounded-gap dense scales, oscillating schedules are polynomially suboptimal on sufficiently sharp contractions; when M(n) = o(ln n), they are super-polynomially or infinitely slow on rotations.The bounded-gap condition requires some c'' > 0 such that {k : c_k ≥ c''} meets every interval of G consecutive integers; the rotation alternative also applies when all positive superlevel sets have gaps tending to infinity.Source: §3.6 · p. 28
4 The master noise lemma and the nonexpansive worst case
A master noise lemma controls stochastic deviation by comparing the noisy iteration with an exact-oracle path using the same predictable coefficients. For nonexpansive maps, this supports an O(Kσ^2D^2ε^-4) bound in 2-uniformly smooth spaces, while a monotone-inclusion reduction gives the minimax Hilbert rate.
4.1 The master noise lemma
- The master noise lemma bounds stochastic deviation by comparing the run with an exact-oracle path using the same coefficients; conditional centering removes the cross term.The recursion extends to 2-uniformly smooth spaces with Kσ^2 replacing σ^2, but coefficients estimated from the same batch do not satisfy the stated conditional-centering argument.Source: §4.1 · p. 29
4.2 The nonexpansive worst case: an O(σ2D2ε−4) upper bound
- O(Kσ^2D^2ε^-4) oracle evaluations suffice for the nonexpansive residual problem in Hilbert and 2-uniformly smooth Banach spaces.The proof uses the classical anchor θ_n=1/(n+2) and batch sizes proportional to k; the result includes ℓp and Lp for 2≤p<∞.Source: §4.2 · p. 30
- The recursion-based bound requires 2-uniform smoothness; outside that class the master recursion fails, and the exponent for arbitrary normed spaces remains open.On ℓp for 1<p<2, no fixed constant repairs the master recursion; the cited lower-bound instances on ℓ1-type spaces are also outside the smooth class.Source: §4.2 · pp. 30–31
- The Banach-space argument replaces Hilbert square expansion with the inequality characterizing 2-uniform smoothness, which bounds the noise contribution by Kσ^2/m_n.Hilbert spaces qualify with K=1, and ℓp and Lp qualify for 2≤p<∞.Source: §4.2 · pp. 30–31
- Under Gaussian or directionally sub-Gaussian noise, the nonexpansive upper bound also has a high-probability version.The result assumes D≥4ε and gives failure probability ϑ; a Markov argument preserves the complexity exponent.Source: §4.2 · pp. 31–32
- The Hilbert-space minimax oracle complexity is ˜Θ(σ^2ε^-2 + Dε^-1), obtained by reducing the residual problem to a stochastic monotone inclusion.The reduction uses F=I−T, which is monotone and 2-Lipschitz, with zer(F)=Fix(T) and ∥F(x)∥=∥x−Tx∥.Source: §4.2 · p. 32
5 The contraction regime: exact oracle complexity
This section characterizes contraction oracle complexity in relation to modulus information: affine maps admit a modulus-free exact rate, while general maps attain the known-modulus rate with geometric batching when a certified modulus bound enables sound distance certification. It also addresses the polynomial cost of anchoring, the impossibility of sound gap certification without a certified modulus bound, and a parallel method for simultaneous contraction and nonexpansive guarantees.
5.1 Lower bound: the affine family
- Theorem 5.1 establishes a Le Cam query lower bound for any adaptive algorithm using single-point bounded-variance oracle evaluations, under γ ∈(0, 1), σ > 0, ε ∈(0, D/2), and ϑ ∈(0, 1/2).Source: §5.1 · pp. 33–34
5.2 Upper bound for affine contractions: the two-point estimator
- For T(x)=γx+(1−γ)z on R, z∈[−D,D], the estimator splits m evaluations evenly between 0 and D and achieves |ẑ−z|≤ε with probability at least 2/3, for m as in (37).Source: §5.2 · pp. 34–35
5.3 General contractions: geometric batching, high probability, and the modulus ceiling
- For bounded-variance noise and known modulus, independent Krasnoselskii–Mann runs with a geometric-median output give a high-probability rate tight up to a ln(D/ε) factor in the stochastic term.The matching lower bound includes a deterministic Ω((1−γ)^-1 ln(D/ε)) term for anchored/Krasnoselskii–Mann schemes; that term is specific to this class and disappears for the full span class.Source: §5.3 · pp. 37, 39
- For a known contraction modulus, geometric batching achieves the general-contraction rate Θ(σ^2 ε^-2 (1−γ)^-2 + (1−γ)^-1 ln(D/ε)) within anchored/Krasnoselskii–Mann schemes.The geometric schedule uses O((1−γ)^-1 ln(D/ε)) iterations and removes the extra logarithm caused by constant batching.Source: §5.3 · pp. 36, 38
- For general contractions, a certified upper bound on γ is sufficient and rate-optimal, but trajectory probes cannot certify the lower bound on 1−γ needed for a sound distance guarantee.Affine maps are an exception because any probe reveals their modulus exactly; without modulus information, general nonlinear maps have no sound distance certificate.Source: §5.3 · p. 39
- Whether one algorithm attains the affine rate across the general contraction class remains open; residual-based schemes are ruled out, and the paper completes the proposed impossibility with a resistant-oracle theorem.The authors conjecture a negative answer in infinite-dimensional Hilbert spaces, where distinguishing structure may be hidden in rarely queried directions.Source: §5.3 · p. 40
5.4 The stochastic two-regime problem: optimal guarantees by parallel composition
- Given a certified ceiling, two parallel tracks attain the optimal contraction rate and best-known nonexpansive residual rate simultaneously, at a factor 2 in evaluations.Each track provides its own worst-case guarantee; the algorithm does not determine which guarantee applies to the instance.Source: §5.4 · p. 40
- Track A achieves the contraction guarantee when γ ≤ γ+, and Track B achieves residual at most ε on nonexpansive instances, with the stated Hilbert and smooth-space costs.The contraction guarantee is optimal in δ+; Track B costs O(Kσ^2D^2ε^-4) in 2-uniformly smooth spaces and ˜O(σ^2ε^-2 + Dε^-1) on Hilbert spaces.Source: §5.4 · p. 40
5.5 The anchoring cost
- For the classical stochastic Halpern schedule, the contraction-dependent cost scales as δ^-3 at fixed D, ε, and σ, while geometric schedules attain the noise floor at exponent δ^-2.Non-summable anchoring leaves algebraic bias of order O(1/(δN)), whereas small-anchor summable-mass schedules exploit geometric Krasnoselskii–Mann dynamics.Source: §5.5 · pp. 41, 43
5.6 Modulus-free certification: the impossibility theorem and the exact boundary
- Without a certified modulus bound, no positive gap lower-bound certificate is uniformly sound in any Hilbert space; a certified ceiling enables optimal-rate certification.The impossibility concerns certification, not convergence; the obstruction also holds with exact oracle responses.Source: §5.6 · pp. 43, 45
6 Numerical validation
Five experiments validate the paper’s scaling predictions across affine and nonlinear contractions, nonexpansive rotations, adaptive escape, and lacunary schedules. The experiments also expose finite-sample constants and schedule-specific behavior alongside the asymptotic rates.
6.1 Experiment 1: affine contractions — exact quadratic scalings
- Fitted batch exponents were 1.99 in 1/(1−γ) and 1.90 in 1/ε, consistent with quadratic scaling for affine contractions.At (γ, ε) = (0.95, 0.1), the measured required batch was about 400 versus the theoretical threshold 192000.Source: §6.1 · p. 46, Figure 1 · p. 46
6.2 Experiment 2: nonlinear contractions — the geometric batch schedule
- Measured nonlinear-contraction query ratios were 4.2 and 4.1 against a theoretical ratio of 4, with fitted exponents 2.0 ± 0.1 and 2.1 ± 0.1.The geometric batch schedule used the supplied modulus; constant batches cost a factor of about 2.3 more in the reported comparison.Source: §6.2 · p. 47, Figure 2 · p. 47
6.3 Experiment 3: nonexpansive rotations — the ε−4 law
- For nonexpansive rotations, query counts approached ε^-4 scaling as additive horizon slack diluted, while rotation decay followed the predicted laws for c = 0.25, 0.5, and 1.The measured octave ratios were 11.6 and 13.3 toward the theoretical 16; for c = 1, dips at nφ ∈ 2πZ reached about 1/(n + 1), not zero.Source: §6.3 · p. 47, Figure 3 · p. 48, Figure 4 · p. 48
6.4 Experiment 4: the adaptive escape — window restarts and the two-track scheme
- On the γ = 0.95 contraction at ε = 0.05, the two-track scheme stopped after 59 steps on the small-anchor track; on R0.01 it stopped after 598 on the classical track.The doubling-window scheme hit in 142 steps (248 at the certified window end), versus 399 for the classical schedule; its improvement was in the constant, not the order.Source: §6.4 · p. 49, Figure 5 · p. 50
6.5 Experiment 5: oscillatory escape — the lacunarity exponent
- All twelve lacunary-schedule escape-time ratios to φ^-1ε^-1/α0 fell in [1.07, 1.23], consistent with the predicted scale up to a log-periodic factor.The fitted ε-exponent was 1.751 versus 1/α0 ≈ 1.7095; at (φ, ε) = (0.01, 0.01), the lacunary schedule hit in 322,243 steps while the small-anchor schedule did not hit within 10^7.Source: Table 1 · p. 49, §6.5 · pp. 49–50
7 Discussion and future research
The discussion consolidates the paper’s complexity results and identifies unresolved boundaries in stochastic adaptivity, angle-specific rotation guarantees, and oracle assumptions.
Nonexpansive complexity
- The Hilbert nonexpansive residual complexity is ˜Θ(σ2ε−2 + Dε−1), while the general 2-uniformly smooth bound is O(Kσ2D2ε−4).For norms outside weak type 2, the exponent remains open: the best upper bound is ˜O(σ2ε−5), against an Ω(Dε−1 + Dσ2ε−3) lower bound.Source: §7 · pp. 50–51
Stochastic contractions
- Geometric batching gives known-modulus stochastic contraction complexity Θ(σ2ε−2δ−2) plus the deterministic term, without a linear/nonlinear dichotomy.Without a certified modulus ceiling, sound data-driven distance certification is impossible; a certified ceiling is the exact boundary.Source: §7 · p. 51
Adaptivity and rotations
- A fixed oscillatory schedule is contraction-optimal and rotation-polynomial with exponent 1/α0, but its pointwise lower-bound guarantee is established for almost every angle, not all Diophantine angles.The pointwise Diophantine statement remains conjectural; extensions to non-block lacunary patterns also remain open.Source: §7 · pp. 51–52
- The stochastic single-stream analogue of the deterministic two-regime result remains open, as does stochastic instance-adaptivity for nonexpansive maps without a modulus.The discussion also leaves open whether a single stream can be optimal for both contraction distance and nonexpansive residual criteria.Source: §7 · pp. 51–52
Oracle assumptions
- All upper bounds assume uniformly bounded variance; state-dependent variance is treatable with logarithmic-factor costs, while heavy-tailed oracles require unpursued truncation arguments.The unresolved stochastic contraction gap is whether replicate–median incurs the extra ln(D/ε) factor or a matching lower bound exists.Source: §7 · p. 52
A The orbit Fourier series
The appendix establishes convergence and non-degeneracy of the orbit Fourier series used in the proof of Theorem 3.21(i).
Purpose
- These two classical facts about K∞(φ) are used in the proof of Theorem 3.21(i).Source: A The orbit Fourier series · p. 52
Convergence
- The coefficients are nonnegative, tend to zero, and have bounded variation, yielding uniform convergence on compact subsets of (0, 2π) by Dirichlet’s test.The resulting limit is real-analytic as a uniform limit of trigonometric polynomials.Source: A The orbit Fourier series · p. 52
Non-degeneracy
- If K∞ vanished on an interval, the identity theorem and Cantor’s uniqueness theorem would force every coefficient to be zero, contradicting their stated non-degeneracy.This establishes that the series cannot vanish on an interval.Source: A The orbit Fourier series · p. 52
Disclosure statement
The disclosure statements report no applicable human-subject or personal-data matters, provide figure-reproduction code, and disclose no competing interests.
Ethics approval and consent to participate
- No human participants, animal subjects, or identifiable personal data are involved.Source: Ethics approval and consent to… · p. 52
Consent for publication
- The manuscript contains no identifiable personal information.Source: Consent for publication · p. 52
Code availability
- A Python script reproducing all figures, tables, and numerical results of Section 6 is available at the stated repository.Source: Code availability · p. 52
Data availability
- No datasets were generated or analyzed; all numerical results are reproducible from the code.Source: Data availability · p. 53
Competing interests
- The author declares no competing interests.Source: Competing interests · p. 53